|
Raw materials preparation plant for full bodied extruded frost proof floor tiles
The main feature of the unit would be alternately to utilize different compositions with different colours (red, yellow and white) enabling the Customer to have a high production flexibility and subsequently extend the range of products accordingly.
Thanks to an impurity free, moisture controlled body the downstream extruding, drying, glazing and firing stages were greatly upgraded with a percentage of first grade up to 95% and a kiln yield increased by more than 35%.
|